• <br /> • <br /> There will be several•storage tanks on-site,including a 1,000,000 gallon raw water <br /> storage tank,used to supply the facility's water needs and for fire protection;a 250,000 gallon <br /> demineralized water storage tank;and two 30,000 gallon aqueous ammonia storage tanks.A <br /> secondary safety containment area,designed to hold 1.10 percent of the entire volume of the <br /> tanks, will be provided around theammonia storage tanks,consistent with New York State <br /> requirements. There also will be on-site storage of small quantities of ultra-low sulfur diesel <br /> (ULSD)fuel and lubricating oils.ULSD storage will:be limited to the firepump's integrated 650 <br /> gallon fuel tank and the four emergency.black start generators; each with an integrated 1,000 <br /> gallon fuel tank. As required;all tanks,equipment:and vessels containing ULSD fuel and/or <br /> lubricating oils will be.located:inside a concrete safety containment; sump or curbed dike area for <br /> spill control and management. <br /> There will be two utility interconnections at the,facility.The electricity generated from <br /> the facility will be transmitted via a 700 foot on-site-overhead interconnect to the existing <br /> Consolidated.Edison Company of New York(ConEd)345.kilovolt electric transmission line <br /> located north of the Project Development Area. A new switchyard and substation,incorporating <br /> gas-insulated switchgear to minimizefootprint requirements,will be built at the facility.Natural <br /> gas will be the sole fuel used for the CTGs.and auxiliary boiler facility,transported via a new <br /> 500 foot, 12 inch gas pipeline from the Iroquois pipeline,just north of the Project Development <br /> Area. <br /> Location. <br /> The project is Located atthe former Mica Products industrial site at 2241 NYS Route 22 <br /> in the Town of:Dover,Dutchess County.The property totals approximately 193 acres, including <br /> 79 acres(west of the Metro-North rail'line)within the Great Swamp Critical Environmental <br /> Area; a 57-acre Project Development Area east of the railroad line;and.an additional57 acres of <br /> industrial land to the south,formerly leased.to Rasco Materials LLC(13 acres of which will be <br /> temporarily used during project construction).This property:isbounded by NYS Route 22 to the <br /> east to the south by residential properties; to the west by the Swamp River;and to the north by <br /> an existing ConEd electric transmissionright-ofway.The project also'includes a temporary <br /> 38.8-acre construction worker parking and laydownsite located approximately 2.5 miles north of <br /> the Project Development Area.(See Attachment# I.,Ciirrent'Project Property,and Attachment# <br /> 2, Remote Laydown Site): <br /> [2] <br />