Laserfiche WebLink
s: <br />Town of Dover <br />126 East Duncan Hill Road '' $ Office of the Land Use Coordinator <br />Dover Plains, NY 12522 (845) 832-6111 ext 100 <br />Notes Olivet.Site Walk <br />Gates: <br />October 28, 2013 <br />o New gates were installed at the Wheeler Road Location <br />o The front gates are in place and in working order <br />0 Property owners have installed landscaping to camouflage the mechanics <br />10/28/13- Incomplete <br />! ! NO KNOX BOX is in place at any gate location <br />! ! The gates should not be operational until all fire safety concerns have been met <br />! ! 10/23/13 Fire Chief requested once Knox boxes are in-place- training should be held for Fire <br />Company members (Knox box information from Fire Chief was hand delivered on 10/28/13) <br />Gate located at property line south end of Hutchinson Avenue has been installed and berm <br />removed- gate is adequate at this time <br />10/28/13 not inspected again <br />time. <br />Gate to be located at property line North end of Hutchinson Avenue has been installed at this <br />10/28/13 not inspected again <br />21 Gate details have been provided to the Code Enforcement Officer <br />Church walkway: <br />10/28/13- Incomplete <br />! ! shows entrance paving stone installation is not complete <br />! ! Since this is the primary ingress and egress- Safety hazard concern - <br />In order for use- this needs to be addressed immediately <br />!!All Exits lights must work, fire extinguishers must be in place, all exit doors must be <br />unobstructed and unlocked when the building is open <br />Bridge over culvert near Ball Field: <br />10/28/13- Incomplete <br />! ! 10/28/13- railings have not been brought up to appropriate height of 42" <br />Railings are currently 37" and must be increased to 42" high <br />Opening at steps is 5'51/2" and grip rail to be installed on inside rail of steps <br />This was not completed <br />Page 1 of 2 <br />