Laserfiche WebLink
OCT 2 9 2013 <br />OLIVET CENTER <br />SITE MANAGEMENT PLAN <br />SITE TASK NARRATIVE <br />October 28, 2013 <br />After years of neglect, the Olivet Center, LLC is in the process of restoring the grounds <br />of the recently acquired project site formerly known as the Harlem Valley State <br />Psychiatric Hospital. The initial site work has included the installation of temporary <br />security gates at various entrances to the site. The security gate installed at the main <br />entrance on Wheeler Road is an electronic gate. <br />Traffic control entry gates (manual operation) have been installed at the North and <br />South entrances to the property on Hutchinson Avenue. These gates will remain locked <br />at all times. Emergency site access will be coordinated with the Town Fire Department <br />to assure immediate access for all first responders to an emergency. <br />Additionally, three (3) existing buildings have received the permits required to be <br />renovated and are shown on the Site Management Plan as Buildings 11, 19 and 23. <br />An Erosion and Sediment Control Plan has been developed for the remaining property <br />and grounds restoration work. The site restoration tasks remaining are the restoration <br />of an existing baseball field to a safe, level and properly graded area, the relocation of <br />two (2) basketball courts and two (2) tennis courts, and the re -grading of another former <br />ball field area (formerly fenced in correctional facility athletic fields) for a proposed use <br />as a soccer field. <br />The site contractor will implement the SMP's that are appropriate for the various tasks <br />on an "as needed" basis. The contractor is responsible for following all procedures and <br />requirements as noted in the Stormwater Pollution Prevention Plan. <br />