Laserfiche WebLink
Town of Dover Planning Board <br />October 21, 2015 <br />Page 2 <br />immediately upon receipt or the Highway Work Permit shall not be issued, or <br />shall be revoked. <br />3. A check for $2,000 made out to the New York State Department of <br />Transportation. <br />4. The items noted above shall be forwarded to the Regional Highway Work Permit <br />Coordinator (address below). <br />Once the PIN is established, the applicant may submit one complete set of the planning <br />documents described below to each of the following: <br />Highway Work Permit Coordinator Permit Engineer <br />NYS Dept. of Transportation NYS Dept. of Transportation <br />4 Burnett Blvd. 106 Ludingtonville Rd. <br />Poughkeepsie, NY 12603 Holmes, NY 12531 <br />Planning Documents: <br />1 set of site plans showing proposed access, and Highway Improvement plans (if <br />available) in paper and PDF format, 1 copy of drainage study/SWPPP in PDF format, 1 <br />copy of Synchro analysis of affected intersections on disc (actual files), 1 copy of the <br />Traffic Impact Study (TIS) in paper and PDF and format. <br />The aforementioned documents should be returned to the Regional Highway Work <br />Permit Coordinator so that a project review may be authorized. <br />Please note; in addition to the paper copy, all future submissions must also include <br />electronic. PDF files on CD, DVD, or thumb drive. <br />Very truly yours, <br />Michael Sassi, PE <br />Highway Work Permit Coordinator <br />cc: Albert DeNigro, Permit Engineer, Residency 8-3 <br />Dutchess County Planning Board <br />Olivet Management, LLC <br />