My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2017-08-31 Cricket Valley Energy August 2017 Update
>
2017-08-31 Cricket Valley Energy August 2017 Update
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/31/2017 11:54:20 AM
Creation date
8/31/2017 11:54:19 AM
Metadata
Fields
Template:
Land Use Projects
Project Name
Cricket Valley Energy Center_2017
Document Name
Cricket Valley Energy August 2017 Update
Date
8/31/2017
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cricket Valley Energy Center Overview 00110 <br /> • Fully-permitted combined cycle natural gas-fired energy center <br /> • Previously abandoned, industrial-zoned site <br /> • 193 acres off Route 22, Dover, New York <br /> • 79 acres of wetlands will remain undisturbed <br /> • No fracking at this facility—CVE is a consumer, not a producer, of natural gas <br /> • Now under construction <br /> • Compact design reuses existing industrial footprint <br /> • Air cooling technology will reduce water use by 98%+ <br /> • No process water will be discharged into Swamp River <br /> • Scheduled for completion first quarter 2020 <br /> Cricket Valley%Energy Monthly Progress Update <br /> Steps for Safety e <br /> • Limited site access <br /> • Required safety training <br /> • Security procedures <br /> • Safety procedures and compliance <br /> Cricket Valley/IEnergy Monthly Progress Update 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.