My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2020_02_Iroquois FERC Filing
Public Login - Dover
>
Public Access
>
Town of Dover
>
Land Use Projects of Public Interest
>
Iroquois Gas Transmission System_Compression Enhancement Project
>
2020_02_Iroquois FERC Filing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/11/2020 3:21:14 PM
Creation date
3/11/2020 3:21:03 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ah <br />•;: Iroquois <br />GAS TRANSMISSION SYSTEM <br />IROQUOIS PIPELINE OPERATING COMPANY, <br />OPERATOR <br />Re: Iroquois Gas Transmission System, L.P. <br />FERC Docket No. CP20-48-000 <br />�.9f7/TF'fFiiA <br />ONE CORPORATE DRIVE, SUITE 600 <br />SHELTON, CT 06484-6211 <br />TEL: (203) 925-7200 <br />FAX: (203) 929-9501 <br />Please be advised that on February 3, 2020, Iroquois Gas Transmission System, L.P. <br />("Iroquois") filed with the Federal Energy Regulatory Commission ("Commission") an <br />application for a Certificate of Public Convenience and Necessity ("Certificate"). In that <br />application, Iroquois seeks authority to construct and operate its Enhancement by <br />Compression ("ExC") Project ("ExC Project" or "Project"). In accordance with the <br />Commission's regulations, Iroquois is hereby providing you, as a landowner, municipality, <br />agency or individual who may be affected by the Project, with some additional information <br />regarding the ExC Project. <br />General Project Description: <br />Iroquois is proposing to construct, own, operate, and maintain certain new natural gas <br />compression and cooling facilities to be located at the sites of four existing Iroquois <br />compressor stations, in Athens, New York; Dover, New York; Brookfield, Connecticut; <br />and Milford, Connecticut (cooling only). There is no new pipeline proposed as part of this <br />Project. A map is provided showing the locations of the Project. <br />The ExC Project has been developed to provide a total of 125,000 Dekatherms per day of <br />incremental firm transportation service to two existing local gas utility customers of Iroquois. <br />The ExC Project is designed to facilitate a rational and orderly transition to a renewable <br />energy future, complementing and supporting the region's policy choices while at the same <br />time addressing the need for incremental natural gas transportation capacity into the region. <br />In order for Iroquois to meet the ExC Project's proposed in-service date of November 1, <br />2023, Iroquois must commence construction of the Project facilities by early Spring 2023. <br />Docket Number: <br />As denoted above, the ExC Project has been assigned a docket number by the Commission: <br />Docket No. CP20-48-000. This docket number should be used in any communication with <br />either Iroquois or the Commission with respect to the ExC Project. Attached please find a <br />copy of the Commission's notice of the filing of Iroquois' application (Notice). Please note <br />that requests to intervene in the proceeding are due to be filed at FERC on March 4, 2020. <br />Instructions on filing at FERC are included in the Notice. <br />
The URL can be used to link to this page
Your browser does not support the video tag.